Allocating Marine Expeditionary Unit equipment and personnel to minimize shortfalls /

For various reasons, including the commander's priorities and expected mission requirements, U.S. Marine Corps amphibious lift requirements, that is, the space needed on ships to transport equipment for a given mission, may exceed the U.S. Navy's lift capacity. Thus, Marine Expeditionary U...

Full description

Bibliographic Details
Corporate Authors: National Defense Research Institute (U.S.), Rand Corporation
Other Authors: Perry, Walt L.
Format: Software eBook
Language:English
Published: Santa Monica, CA : Rand Corporation, 2012.
Series:Technical report (Rand Corporation) ; TR-1253-OSD.
Subjects:

MARC

LEADER 00000cam a2200000Ia 4500
001 in00002755937
005 20150922105612.0
007 co cgu||||||||
008 120715s2012 caua b 000 0 eng d
020 |a 9780833076199 
020 |a 0833076191 
035 |a (OCoLC)ocn800042997 
035 |a (OCoLC)800042997 
040 |a BTCTA  |b eng  |c BTCTA  |d YDXCP  |d DID  |d TXA  |d UtOrBLW 
043 |a n-us--- 
049 |a TXAM 
088 |a RAND TR1253 
090 |a VE353  |b .A45 2012 
245 0 0 |a Allocating Marine Expeditionary Unit equipment and personnel to minimize shortfalls /  |c Walter L. Perry [and others]. 
264 1 |a Santa Monica, CA :  |b Rand Corporation,  |c 2012. 
300 |a xxvi, 120 pages :  |b color illustrations ;  |c 28 cm. +  |e 1 CD-ROM (4 3/4 in.) 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a computer disc  |b cd  |2 rdacarrier 
490 1 |a RAND Corporation technical report series ;  |v TR-1253-OSD 
500 |a "National Defense Research Institute." 
504 |a Includes bibliographical references (pages 119-120). 
505 2 |a Introduction -- Mission deconstruction -- Equipment, personnel, metrics, and planning factors -- The MAGTF Equipment Structural Assessment (MESA) application -- Conclusion -- Appendixes -- Bibliography. 
520 |a For various reasons, including the commander's priorities and expected mission requirements, U.S. Marine Corps amphibious lift requirements, that is, the space needed on ships to transport equipment for a given mission, may exceed the U.S. Navy's lift capacity. Thus, Marine Expeditionary Units (MEUs) afloat generally do not have all their support personnel and equipment on board. What is the impact of this shortfall on a MEU's ability to complete the tasks associated with its mission, especially when the mission includes reconstruction and stabilization operations? Close examination reveals that, in general, MEUs do not fail as a result of these equipment shortfalls; Marine Corps commanders are able to make use of the equipment they have in innovative and creative ways to accomplish the tasks at hand. However, equipment shortfalls do force shortcuts and sometimes sacrifice the quality and speed of task completion. This report describes the development of an automated tool for allocating both equipment and personnel to complete the tasks associated with 15 MEU missions, highlighting the associated equipment implications. 
536 |a Prepared for the Office of the Secretary of Defense (OSD). The research was conducted within the RAND National Defense Research Institute, a federally funded research and development center sponsored by OSD, the Joint Staff, the Unified Combatant Commands, the Navy, the Marine Corps, the defense agencies, and the defense Intelligence Community  |b W74V8H-06-C-0002. 
610 1 0 |a United States.  |b Marine Corps  |x Equipment. 
700 1 |a Perry, Walt L. 
710 2 |a National Defense Research Institute (U.S.) 
710 2 |a Rand Corporation. 
830 0 |a Technical report (Rand Corporation) ;  |v TR-1253-OSD. 
994 |a C0  |b TXA 
948 |a cataloged  |b h  |c 2012/8/7  |d c  |e nbehmer  |f 9:27:48 am 
999 |a MARS 
999 f f |s b9362050-2df5-35a5-8d94-c8a621888530  |i bbcbe910-265f-35c2-baee-d3b1583214b7  |t 0 
952 f f |p normal  |a Texas A&M University  |b College Station  |c Sterling C. Evans Library  |d Evans: Library Stacks  |t 0  |e VE353 .A45 2012  |h Library of Congress classification  |i computer -- computer disc  |m A14841439532 
998 f f |a VE353 .A45 2012  |t 0  |l Evans: Library Stacks