Draft NUREG-1477, "Voltage-based interim plugging criteria for steam generator tubes".

Bibliographic Details
Corporate Author: U.S. Nuclear Regulatory Commission. Office of Nuclear Reactor Regulation
Format: Government Document eBook
Language:English
Published: Washington, D.C. : United States Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation, [1993]
Series:NRC information notice ; 93-52.
Subjects:
Online Access:https://purl.fdlp.gov/GPO/gpo32890

MARC

LEADER 00000cam a2200000Ii 4500
001 in00002814665
005 20211120170809.0
006 m o d f
007 cr mn|||||||||
008 130109s1993 dcu o f000 0 eng d
035 |a (OCoLC)ocn823759117 
040 |a GPO  |b eng  |e rda  |c GPO  |d GPO  |d MvI  |d UtOrBLW 
043 |a n-us--- 
049 |a WWW 
074 |a 1051-H-08 (online) 
086 0 |a Y 3.N 88:56-2/93-52 
245 0 0 |a Draft NUREG-1477, "Voltage-based interim plugging criteria for steam generator tubes". 
246 3 0 |a Voltage-based interim plugging criteria for steam generator tubes 
264 1 |a Washington, D.C. :  |b United States Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation,  |c [1993] 
300 |a 1 online resource. 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
490 1 |a NRC information notice ;  |v 93-52 
500 |a Title from title screen (viewed Jan. 9, 2013). 
500 |a "July 14, 1993." 
650 0 |a Nuclear power plants  |x Piping  |z United States  |x Safety measures. 
650 0 |a Steam-boilers. 
710 2 |a U.S. Nuclear Regulatory Commission.  |b Office of Nuclear Reactor Regulation. 
830 0 |a NRC information notice ;  |v 93-52. 
856 4 0 |u https://purl.fdlp.gov/GPO/gpo32890  |t 0 
999 |a MARS 
999 f f |s 447f4749-d0a2-3ce5-8d0e-a7a84353e0f5  |i 1b66cddc-b061-35cd-8b90-18a6b90510a6  |t 0 
952 f f |a Texas A&M University  |b College Station  |c Electronic Resources  |d Available Online  |t 0  |e Y 3.N 88:56-2/93-52  |h Superintendent of Documents classification 
998 f f |a Y 3.N 88:56-2/93-52  |t 0  |l Available Online